Comment: Why off-site is the place to be for construction

01/08/2018 |

DELTA BLOC UK's MD Tony Walker tells Highways about how his leading road barrier company is part of a new era of modular off-site construction and supply chain innovation helping major clients like Highways England meet their objectives.

The introduction of standardised, modularised, and prefabricated components through off-site construction is expected to grow, which has certainly proven to be the case with DELTA BLOC UK a manufacturer, supplier and installer of precast concrete road safety barrier systems.

Following a tough start to UK business in 2010, we have seen a significant increase in both sales and general interest in our precast concrete barrier systems over the last three years as the market has slowly adjusted to new concepts and ideas

Our recent involvement with installations on a number of projects in the Highways England Smart Motorway programme was a key milestone for us because it demonstrates very clearly that the market place now sees precast concrete as a very credible alternative to the more commonly used slipform methods of construction.

DELTA BLOC products are manufactured off-site and the modular lean construction process means a quick and efficient on-site operation, where the quality of the product can be guaranteed first time. These are both key factors, which could help achieve Highways England’s goal of reduced delivery and installation times.

There are no issues to overcome with supply of ready mixed concrete and inclement weather, both of which can be very problematic when carrying out slipform operations and it is for these reasons that many of Highways England’s delivery partners are now looking more favourably at precast barrier solutions for the central reserve.

For many contractors, to meet their construction programme, certainty of delivery all year round is a key driver. The modular, off-site construction approach also means less waste is generated in production providing a more sustainable, environmentally friendly product.

Delivery truck movements are also halved when installing the DELTA BLOC systems compared to the number of concrete truck mixers attending site for the same length of slipform barrier. This reduces traffic entering and exiting the works zone, improving safety, reducing CO² emissions, and keeps the network flowing, further demonstrating the positive benefits of the precast installation process.

The use of DELTA BLOC products on Highways England Smart Motorway projects shows that clients now have the confidence not only in the product, but also in the company to deliver schemes of this magnitude. CE marked products produced in a factory environment are delivered and installed on-site by competent and trained installers, providing maximum protection for road users, while minimising disruption.

Additionally, it also shows that DELTA BLOC UK can provide the full range of services from technical assistance up-front through to completion.

Increased productivity of precast concrete barrier systems over slipform barrier solutions;

  • Up to five times faster installation than in-situ barrier systems = reduced programme
  • Ability to change work fronts with minimal impact if critical path issues are identified at structures or there are breakdowns = more flexibility
  • No weather dependence allowing installation in cold or wet conditions = reduced risk
  • Freestanding systems can be connected to form any emergency crossing points required in the barrier chain = full compatibility
  • Easily connected to adjacent steel barrier systems through DELTA BLOC transition units
  • Useable as a temporary barrier in traffic management before incorporation into permanent works = reduced costs and minimised disruption in maintenance
  • Should a vehicle impact result in a need for replacement of barrier, pre-cast sections can be replaced in one shift as opposed to multiple shifts needed for in-situ repair = reduced costs, quicker, safer, less disruption
  • Pre-cast units can be easily lifted out to create a temporary maintenance crossover
  • Public safety – Improving travelling public safety and minimising disruption through fewer movements into and out of site
  • Site safety – 50% reduction in barrier installation personnel exposed to traffic risk
  • Better quality – Certainty of quality for materials, finishes and fit prefabricated in factory controlled conditions = right first time
  • Sustainability: No flushing / cleaning or waste concrete = reduced site waste

Precast concrete vehicle restraint systems can provide measurable benefits to all stakeholders and DELTA BLOC UK hope that their recent successes will provide further evidence to Highways England and their delivery partners that precast solutions can be advantageous when delivering Strategic Road Network projects.

Highways InProfile

latest magazine issue
Highways jobs

Chartered Civil Engineer – Highways Specialist

£65,000 - £80,000 based on experience.
We are looking for a driven and experienced Chartered Civil Engineer with a strong background in highways engineering to join our team. Bristol based offices. Hybrid (2 days in office) or remote working for the right candidate.
Recruiter: W.D.M. Limited

Professional Services Partnering Manager

Grade 13 £49,178 - £52,937 per annum
Are you passionate about infrastructure, partnership management and making a real impact? Derbyshire
Recruiter: Derbyshire County Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Kirby Misperton, Malton
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Boroughbridge, York
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Whitby, North Yorkshire
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Selby, North Yorkshire
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Highways Engineer

£52,194 - £55,323 per annum
We’d love you to join us at the London Borough of Hounslow! Hounslow (City/Town), London (Greater) (GB)
Recruiter: Hounslow London Borough Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Thirsk, North Yorkshire
Recruiter: North Yorkshire Council

Roads Strategy Director & National Highways Client Director

circa £100,000
Transport is fundamental to everyday life, connecting people to work, education, leisure and opportunity. Leeds / Birmingham / London
Recruiter: Department for Transport

Bridges Engineer

Grade 8 - Grade 10
The Key purpose of this position within the Highways Network Management Team Wakefield, West Yorkshire
Recruiter: Wakefield Council

Assistant Highways Network Technician - WMF2343e

£26,403 - £26,824
This role will be part of the Network Team in the South Lakeland area based in Kendal. Kendal, Cumbria
Recruiter: Westmorland and Furness Council

Principal Engineer - Adoptions

£46,878 - £50,071
We are seeking an experienced and motivated Principal Highways Engineer to join our Highways Development Management team. Northamptonshire
Recruiter: West Northamptonshire Council

Asset Senior Maintenance Engineer (CDC)

Grade 10, £47,154 – £51,235
Do you have a positive approach to work and enjoy the challenge of a busy role? Doncaster, South Yorkshire
Recruiter: City Of Doncaster Council

Arboricultural Consultant

£36168.0000 - £42551.0000 per annum
Arboricultural ConsultantPermanentFull Time, 37 hours per week£36,168 to £42,551 per annumLocation
Recruiter: Essex County Council

Senior Engineer

Starting Salary from £43,545 based on skills and
Job TitleSenior Engineer (x2 v... Frogmore Complex, Wandsworth, London,
Recruiter: London Borough of Richmond upon Thames and London Borough of Wandsworth

Assistant Traffic Management Technician - WMF2311e

£26,403 - £26,824
This is a predominantly office-based role with some site visits required. Penrith, Cumbria
Recruiter: Westmorland and Furness Council

Senior Lawyer Planning and Highways - WMF2312e

£56,883 - £59,198
To be a success in our Legal Team you will have experience as a Planning and Highways Lawyer Cumbria / Various
Recruiter: Westmorland and Furness Council

Civil Engineering Technician (HDM)

Grade 4 - Grade 6
Do you want to join a team helping to shape the future of Wakefield through Highways Development Management? Wakefield, West Yorkshire
Recruiter: Wakefield Council

Highways Maintenance Operative Apprentice

£28,729.00 per annum (Subject to review)
As part of your apprenticeship, you will be enrolled onto a Lead Traffic Management operative course Staffordshire
Recruiter: Amey
SUBSCRIBE NOW

Latest Video

Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.

SUBSCRIBE NOW