Gull Wing bridge takes flight

09/09/2024 | CHRIS AMES

Suffolk County Council has celebrated the ‘long-awaited’ unveiling of the third Lake Lothing crossing in Lowestoft, the unique Gull Wing bridge, and heralded 'a new era of connectivity and regeneration'.

Thousands of local residents walked, wheeled and drove the town’s new bridge as it opened to the public on Saturday (7 September).

The county council said the structure, built by civil engineering contractor Farrans, promises to bring both immediate and long-term benefits to Lowestoft, its businesses and residents.

It added that by providing another route over Lake Lothing – a man-made navigable canal that links Oulton Broad to the North Sea – it will significantly ease traffic congestion in the town centre.

Funding for the £145m structure, which was originally due to open last year, included £73m from the Local Growth Fund.

Council leader Matthew Hicks said: ‘Today is a significant moment in Lowestoft’s proud history, and it was wonderful to see so many local people being part of it.

‘The Gull Wing will not only serve as a vital transport link between north and south Lowestoft, but also stands as an iconic new landmark for the town.’

Farrans project manager Tristram Browne said: ‘Our team is proud to have delivered the iconic Gull Wing Bridge for the town of Lowestoft.

‘We have brought the region on the journey of the bridge build with us, creating some memorable sights with the arrival of the bridge and bascule sections. It has been a pleasure to work on such a complex, technical project and we would like to thank the local community for their support.’

A formal opening and naming ceremony is set to take place in November.

Facts and figures

  • The Gull Wing is the largest rolling bascule bridge in the world lifted using hydraulic cylinders.
  • It is 345 metres in length and links the southern and northern parts of Lowestoft.
  • The main bascule span across the navigation channel leaves a clear gap of 32 metres for marine vessels.
  • The bridge sits clear of the highest tide by 12m, meaning that the tips of the J-beams will usually be well over 50m above the sea below.
  • The main foundations for the bridge are bored into the soil for a depth in excess of 60 metres.
  • The bascule is designed to last 120 years.
  • It takes 116 seconds to open the bascule bridge in normal wind conditions.
  • The design of the J-beams is a nod to the role of Lowestoft in offshore wind farms off the coast of East Suffolk.
  • The main steelwork was fabricated in Belgium and sections were transported across the North Sea.
  • The name Gull Wing was chosen following a competition with local schools.

Highways InProfile

latest magazine issue
Highways jobs

Chartered Civil Engineer – Highways Specialist

£65,000 - £80,000 based on experience.
We are looking for a driven and experienced Chartered Civil Engineer with a strong background in highways engineering to join our team. Bristol based offices. Hybrid (2 days in office) or remote working for the right candidate.
Recruiter: W.D.M. Limited

Professional Services Partnering Manager

Grade 13 £49,178 - £52,937 per annum
Are you passionate about infrastructure, partnership management and making a real impact? Derbyshire
Recruiter: Derbyshire County Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Kirby Misperton, Malton
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Boroughbridge, York
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Whitby, North Yorkshire
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Selby, North Yorkshire
Recruiter: North Yorkshire Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Skipton, North Yorkshire
Recruiter: North Yorkshire Council

Senior Highways Engineer

£52,194 - £55,323 per annum
We’d love you to join us at the London Borough of Hounslow! Hounslow (City/Town), London (Greater) (GB)
Recruiter: Hounslow London Borough Council

Highways Technical Assistant

£29,064 - £31,537 per annum
Would you like to be part of one of our friendly, welcoming Highways teams, who are proud to manage all aspects of the highway network? Thirsk, North Yorkshire
Recruiter: North Yorkshire Council

Roads Strategy Director & National Highways Client Director

circa £100,000
Transport is fundamental to everyday life, connecting people to work, education, leisure and opportunity. Leeds / Birmingham / London
Recruiter: Department for Transport

Bridges Engineer

Grade 8 - Grade 10
The Key purpose of this position within the Highways Network Management Team Wakefield, West Yorkshire
Recruiter: Wakefield Council

Assistant Highways Network Technician - WMF2343e

£26,403 - £26,824
This role will be part of the Network Team in the South Lakeland area based in Kendal. Kendal, Cumbria
Recruiter: Westmorland and Furness Council

Principal Engineer - Adoptions

£46,878 - £50,071
We are seeking an experienced and motivated Principal Highways Engineer to join our Highways Development Management team. Northamptonshire
Recruiter: West Northamptonshire Council

Asset Senior Maintenance Engineer (CDC)

Grade 10, £47,154 – £51,235
Do you have a positive approach to work and enjoy the challenge of a busy role? Doncaster, South Yorkshire
Recruiter: City Of Doncaster Council

Arboricultural Consultant

£36168.0000 - £42551.0000 per annum
Arboricultural ConsultantPermanentFull Time, 37 hours per week£36,168 to £42,551 per annumLocation
Recruiter: Essex County Council

Senior Engineer

Starting Salary from £43,545 based on skills and
Job TitleSenior Engineer (x2 v... Frogmore Complex, Wandsworth, London,
Recruiter: London Borough of Richmond upon Thames and London Borough of Wandsworth

Assistant Traffic Management Technician - WMF2311e

£26,403 - £26,824
This is a predominantly office-based role with some site visits required. Penrith, Cumbria
Recruiter: Westmorland and Furness Council

Senior Lawyer Planning and Highways - WMF2312e

£56,883 - £59,198
To be a success in our Legal Team you will have experience as a Planning and Highways Lawyer Cumbria / Various
Recruiter: Westmorland and Furness Council

Civil Engineering Technician (HDM)

Grade 4 - Grade 6
Do you want to join a team helping to shape the future of Wakefield through Highways Development Management? Wakefield, West Yorkshire
Recruiter: Wakefield Council

Highways Maintenance Operative Apprentice

£28,729.00 per annum (Subject to review)
As part of your apprenticeship, you will be enrolled onto a Lead Traffic Management operative course Staffordshire
Recruiter: Amey
SUBSCRIBE NOW

Latest Video

Subscribe to Highways today to ensure you keep your finger on the pulse of everything happening in the UK road network throughout the year.

SUBSCRIBE NOW